Sr. No. |
Description |
Name of the Client |
Order No. & Date |
|
|
|
|
1 |
Supply, Fabrication, Erection of 1250 KL Tanks for Edible Oil. |
Frigorifico Allana |
LOI-1250KLTank/FAL-KPL/15-16 |
2 |
Unloading, Leading, Shifting, Assembly, Installation, Alignment and testing of Rotary Kiln, Dryer & Cooler. |
Ashapura Minechem Limited |
AML/BAR/CER/HK/008A/2014-2015 |
3 |
Handling & Collection of materials at BHEL site, Erection, Testing & Assistance for commissioning, Trial operation & handing over of Balance Boiler & its |
M/s. BHEL (Bharat Heavy Electricals Limited) |
L.O.I: BHE/PW/PUR/AMRT-BAL BLR U # 4/ 1247-LOI Dated. 12.05.2014 |
4 |
Fabrication & Erection of Structurals's of kinder garden University at Saudi Arabia |
M/s. Riyadh Aldar for Projects Est. |
LOI:Nil , Dated: 07.04.2014 |
5 |
Supply, Installation, Erection, & Commissioing of Piping Systemfor Bitumen facility |
M/s. Prime Star petroleum & infrastructure |
PSP-1006 Dated:29.04.2014 |
6 |
Supply, Fabrication, |
M/s. JSW Steel Coated |
TRPR/13-14/9100012974 Dated: 29.03.2014 |
7 |
Dismatling, Transportation, erection & Commissioing |
M/s. Privi Organics |
LOI:Nil , |
8 |
Fabrication,Erection, testing & commissioning of Bitumen Storage tanks & thermic fluid heater at Thane, Maharashtra |
M/s. Prime Star |
PSP-1001 |
9 |
Fabrication,Erection & Unloading of Millducting, Chutes,Hoppers,Silo's etc. at Hamala, Gujarat. |
M/s. Ashapura Minechem Limited. |
AML/HAMLA//017-A/2013-14 |
10 |
Dismantling, Erection,overhualing & Commsisioining of 10 TPH Thermax |
M/s. Balkrishna Paper Mills Ltd |
FY:262 |
11 |
Fabrication & Erection of pipes and Pipes Fittings at Halkarni, Kolhapur. |
M/s. AVH Chemical Pvt.Ltd. |
AVH/MUM/S/PROJ/038 Dated: 19.06.2013 |
12 |
Supply, Erection, Fabrication,installattion & Commissioning of WTP and ETP, at Bhuj, Gujarat |
M/s. Balkrishna Tyres Industries |
4800010043 & 4200007094 |
13 |
Fabrication and erection of hopper/Silo/Equipments unloading & shifting at Ashpura , Gujarat |
M/s. Ashapura Volclay Limited |
AVL/PUR/LJ-27A/2013-14 Dated:16.01.2014 |
14 |
Fabrication,Alignment,Testing of tanks and erection of technological structures along with sheeting for coal Tar Distillation plant at Halkarni, Kolhapur. |
M/s. AVH Chemical Pvt.Ltd. |
AVH/MUM/E/PROJ/012 Dated. 17.09.2012 |