Sr. No. |
Description |
Name |
Order |
1 |
Operation & Maintenance of 32 TPH AFBC Boiler |
M/s. Balkrishna Paper Mills Ltd |
199/2013-2015 Dated:28.02.2013 |
2 |
Operation & Maintenance of 14 TPH FBC Boiler ,FBC Thermo pack, coal Handling Plant and DM Plant, Hand Fired Boiler/Hand Fired Thrmopack. |
M/s. Morarjee Textiles Ltd. |
MTL/LEPL/BTOM/WO/2013/03 Dated: 18.03.2013 |
3 |
Operation & Maintenance for Coal fired Boiler 14 TPH (Utility Equipment ,DM Water Plant) |
M/s. Nocil Ltd. |
4300001195 Dated:09.05.2014 |
4 |
Operation & Maintenance of Coal Fired Boiler (14 TPH ) & ancillary equipment. |
M/s. Nocil Ltd. |
POC/2013/07/56 Dated: 30.07.2013 |
5 |
3 MW CPP Operation & maintenance of 16 TPH Boiler along with associated & Turbine. |
M/s. Ruchi Soya Inds.Pvt. Ltd.- |
RSIL/NGP/PO/225 Dated: 14.01.2011 |
6 |
6 MW CPP.Operation & maintenance of Boiler (25 TPH) and Turbine - 6 M.W power plant, continuously in 3 shifts (24 hours x 7 days basis). |
M/s. Biltube Industries. |
LOI/LEPL/1004 Dated: 09.04.2010 |
7 |
(2x4 TPH /10 Kg/sq.cm AFBC Boiler handling, feeding & operation of complete coal handling system) |
M/s. Inventys |
IRCPL/BTB/11-12/P9/EC1F/990 Dated: 31.03.2010 |
8 |
4.5 MW CPP TG Operation & maintenance of 25 TPH Boiler along with associated & Turbine. |
M/s. Ruchi Soya Inds. Ltd.. |
RSIL/GDR-II/PO/306 Dated: 24.09.2009 |
9 |
Activities for 2nos. (10TPHx21kg/cm2) capacity Boiler , Ash handling, Bed Material Coal, unloading ,shifting , loading up to conveyor manually etc. |
M/s. Ruchi Soya Inds.Ltd. |
RSIL/MP-CONT/WSHM/08-09/49 Dated: 22.01.2009 |